PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Continued prepping and installing wire mesh for the slab on grade Facing South (800x600).jpg Installing rebar for the slab on grade Facing North-East (800x600).jpg Poured the concrete slab on deck (2nd Floor) Facing East (800x600).jpg Installed shear studs at the 4th Floor Facing East (800x600) (2).jpg Installed shear studs at the 4th Floor Facing East (800x600).jpg Installed temporary lighting and power at the 3rd Floor Facing North-East (800x600).jpg
Previous pageNext page Installing rebar for the slab on grade Facing North-East (800x600)
Installing rebar for the slab on grade Facing North-East (800x600)